2001

SEPTEMBER

The ATLAS central solenoid magnet arrives from Japan. It weighs 5.5 tonnes and will provide a 2 teslas magnetic field to measure the momentum of charged particles in the inner detector.

Arrival of the ATLAS solenoid from Japan

SEPTEMBER

The first phase of the LHC Computing Grid project is approved by the CERN Council.

OCTOBER

The second test string of superconducting magnets reached the nominal current of 11 850 amps. String two, as it was called, was put together to test all of the magnet systems.

The prototype LHC full cell during test

OCTOBER

The second and final transfer tunnel from the SPS breaks through to the LHC tunnel. Beams will circulate around the SPS accelerator before entering the LHC and colliding.

 

year 2005 year 2005-1 year 2005-2 year 2005-3 year 2004-5 year 2004-4 year 2004-3 year 2004-2 year 2004-1 year 2003-6 year 2003-5 year 2003-4 year 2003-3 year 2003-2 year 2003-1 year 2003 year 2002-3 year 2002-2 year 2002-1 year 2002 year 2001-4 year 2001-3 year 2001-2 year 2001-1 year 2001 year 2000-2 year 2000-1 year 2000 year 1999-2 year 1999-1 year 1999 year 1998-2 year 1998-1 year 1998 year 1997 year 2005-9 year 2005-8 year 2005-7 year 2005-6 year 2005-5 year 2005-4 year 1996 year 1995 year 1994 year 1997-1 year 2006-7 year 2006-6 year 2006-5 year 2006-4 year 2006-3 year 2006-2 year 2006-1 year 2006 year 2007 year 2007-1 year 2007-2 year 2007-3 year 2007-4 year 2007-5 year 2008